These are images of projects recently completed by
Craftsman Foundation Repair
Click on thumbnails for larger pic.
(Please disable pop up blocker.
Pictures open in pop up window...)
After
Caisson-poured toos
Caisson-poured
Crawlhole shed
deepened pier footing
Garage perimter poured from inside
Perimter-Pump for Concrete
two plate straps
Pier-just pouredd
Pier-poured and new beam
Piers-all done
Piers-tall
Porch-new steps
Porch
Slab-6thick
slab-also ready for pour
Slab-epoxy injection ports
Slab-ready for concrete also
Slab-Sawcut ready for pour
Slab-stitches and epoxy
Slabs-ready to pour too
slabs-ready to pour
Stemwall excavated
Stemwall-bracing and forms
Stemwall bracing inside
Stemwall-freshly poured
Stemwall-Just poured also
Stemwall-just pumped-cripple wal
Stemwall-plate strap
Stemwall-poured and ready for siding
Stemwall-pouring curb
Stemwall-ready for inspection also
Stemwall-ready for inspection
Stemwall-ready to pour inside
stemwall-pumping concrete into forms