![]()
| These are images of projects recently completed by Craftsman Foundation Repair |
||
|---|---|---|
| Click on thumbnails for larger pic. (Please disable pop up blocker. Pictures open in pop up window...) |
||
After |
Caisson-poured toos |
Caisson-poured |
Crawlhole shed |
deepened pier footing |
Garage perimter poured from inside |
Perimter-Pump for Concrete |
two plate straps |
Pier-just pouredd |
Pier-poured and new beam |
Piers-all done |
Piers-tall |
Porch-new steps |
Porch |
Slab-6thick |
slab-also ready for pour |
Slab-epoxy injection ports |
Slab-ready for concrete also |
Slab-Sawcut ready for pour |
Slab-stitches and epoxy |
Slabs-ready to pour too |
slabs-ready to pour |
Stemwall excavated |
Stemwall-bracing and forms |
Stemwall bracing inside |
Stemwall-freshly poured |
Stemwall-Just poured also |
Stemwall-just pumped-cripple wal |
Stemwall-plate strap |
Stemwall-poured and ready for siding |
Stemwall-pouring curb |
Stemwall-ready for inspection also |
Stemwall-ready for inspection |
Stemwall-ready to pour inside |
stemwall-pumping concrete into forms |
|